Electric generating plantEIA plant no. 62483

Taygete Energy Project LLC

Type
Solar Photovoltaic
Nameplate capacity
255 MW
Units
1
In service since
2021
Operator
Taygete Energy Project LLC
Location
Coyanosa, Pecos County, Texas
Rated 214th largest in Texas · 1251st of 14,761 in the U.S. · by nameplate

Taygete Energy Project LLC is a solar power plant in Texas with a nameplate capacity of 255 MW. It generates roughly 541.1k MWh per year — enough to power about 51,536 average U.S. homes.

Its capacity factor of 24% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Taygete Energy Project LLC could make 2.2M MWh. In 2023 it made 541.1k MWh — the same as running at full power 24 hours in every 100.

Nameplate, full year2.2M MWh255 MW × 8,760 hours
Actually generated541.1k MWhEPA eGRID, 2023 · ≈51,536 homes

Peaking or variableCapacity factor 24%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBattery Storage

Location

AddressTbd
CityCoyanosa
CountyPecos County
StateTexas
ZIP79730
Coordinates31.16524, -103.12587
OperatorTaygete Energy Project LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar255 MWOperating2021

Ownership

OwnerLocationShare
TE Taygete Energy HoldCo, LLCAustin, TX10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Pecos County

View all plants in Pecos County →

Data centers near Taygete Energy Project LLC

Data centerOperatorDistance
Data centerNot recorded7.9 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more