Clark, Nevada · Plant code 62440

Techren Solar V

Techren Solar V is a solar plant in Clark, Nevada. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

Primary fuel Solar

Route-friendly label and badge.

Total capacity 50 MW

Plant nameplate capacity.

Annual generation 116,924 MWh

Annual output from imported EIA and EPA records.

Capacity factor 28%

A simple way to compare utilization.

Operations

Operations details

Sector IPP Non-CHP

Utility, IPP, industrial, or commercial style ownership.

Status Operating

Current operating status in the imported records.

Online year 2,020

Useful for technology-vintage context.

Location Boulder, Nevada

County and state routing anchor.

Emissions

Emissions details

CO2 0 tons

Annual plant-level total.

SO2 0 tons

Annual sulfur dioxide.

NOx 0 tons

Annual nitrogen oxides.

CO2 rate 0 lbs/MWh

Emission intensity, when available.

Fuel mix

Generation by fuel at the site.

Solar 116,924 MWh · 100% of generation

Ownership

Who owns the plant.

Owner KKR/GA

100%

Generators

Generator-level detail

Generator Technology Fuel Capacity Status Online
TECH5 Solar Photovoltaic Solar 50 MW Operating 2,020

Generation trend

Monthly output pattern

5,652 MWh
Jan
7,343 MWh
Feb
10,243 MWh
Mar
12,800 MWh
Apr
15,916 MWh
May
13,026 MWh
Jun
11,240 MWh
Jul
11,214 MWh
Aug
9,761 MWh
Sep
8,521 MWh
Oct
6,073 MWh
Nov
5,135 MWh
Dec

Nearby plants

Closest comparison sites

Clark, Nevada

Techren Solar IV LLC

Solar

Techren Solar IV LLC is a solar plant in Clark, Nevada. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

25 MW 57,636 MWh 0 tons CO2
KKR/GA 0.8 mi away

Clark, Nevada

Copper Mountain Solar 3

Solar

Copper Mountain Solar 3 is a solar plant in Clark, Nevada. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

255 MW 610,984 MWh 0 tons CO2
Consolidated Edison Development Inc. 1.9 mi away

Clark, Nevada

Techren Solar II LLC

Solar

Techren Solar II LLC is a solar plant in Clark, Nevada. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

200 MW 503,228 MWh 0 tons CO2
KKR/GA 2.8 mi away
Solar

Townsite Solar Project Hybrid is a solar plant in Clark, Nevada. This page is assembled from imported EIA-860, EIA-923, and EPA eGRID records.

270 MW 440,001 MWh 0 tons CO2
Townsite Solar, LLC 3.5 mi away

Related routes

Context around this plant