Electric generating plantEIA plant no. 64098

Tesla Reno GigaFactory

Type
Solar Photovoltaic
Nameplate capacity
6.7 MW
Units
6
In service since
2019–2022
Operator
Tesla Inc.
Location
Sparks, Storey County, Nevada
Rated 99th largest in Nevada · 6996th of 14,761 in the U.S. · by nameplate

Tesla Reno GigaFactory is a solar power plant in Nevada with a nameplate capacity of 6.7 MW. It generates roughly 11.1k MWh per year — enough to power about 1,058 average U.S. homes.

Its capacity factor of 19% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Tesla Reno GigaFactory could make 58.7k MWh. In 2023 it made 11.1k MWh — the same as running at full power 19 hours in every 100.

Nameplate, full year58.7k MWh6.7 MW × 8,760 hours
Actually generated11.1k MWhEPA eGRID, 2023 · ≈1,058 homes

Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomassGeothermal

Location

Address1 Electric Ave
CitySparks
CountyStorey County
StateNevada
ZIP89434
Coordinates39.53951, -119.43916
OperatorTesla Inc.

Generators (6)

IDTechnologyFuelNameplate capacityStatusOnline
RCSolar PhotovoltaicSolar2.0 MWOperating2022
RBSolar PhotovoltaicSolar1.8 MWOperating2022
RASolar PhotovoltaicSolar1.1 MWOperating2022
5Solar PhotovoltaicSolar0.9 MWOperating2021
2Solar PhotovoltaicSolar0.5 MWOperating2019
1Solar PhotovoltaicSolar0.4 MWOperating2019

Grid context

NERC RegionWECC
Balancing AuthorityNevada Power Company

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Storey County

View all plants in Storey County →

Data centers near Tesla Reno GigaFactory

Data centerOperatorDistance
Tahoe Reno 1Switch2.6 mi
Tahoe Reno 2Switch3.0 mi
Tahoe Reno 3Switch3.1 mi
Tahoe Reno 4Switch3.1 mi
Tahoe Reno 5Switch3.2 mi
Data center, SparksNot recorded5.6 mi
Data center, SparksNot recorded5.9 mi
Data center, SparksNot recorded6.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more