Electric generating plantEIA plant no. 67272

The Village at Orchard Ridge (TVOR)

Type
Solar Photovoltaic
Nameplate capacity
1.4 MW
Units
1
In service since
2023
Operator
Distributed Solar Development, LLC
Location
Winchester, Frederick County, Virginia
Rated 253rd largest in Virginia · 13098th of 14,761 in the U.S. · by nameplate

The Village at Orchard Ridge (TVOR) is a solar power plant in Virginia with a nameplate capacity of 1.4 MW. It generates roughly 2.0k MWh per year — enough to power about 194 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, The Village at Orchard Ridge (TVOR) could make 12.3k MWh. In 2023 it made 2.0k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year12.3k MWh1.4 MW × 8,760 hours
Actually generated2.0k MWhEPA eGRID, 2023 · ≈194 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolarBiomass

Location

Address400 Clocktower Ridge Drive
CityWinchester
CountyFrederick County
StateVirginia
ZIP22603
Coordinates39.20156, -78.21391
OperatorDistributed Solar Development, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
P5412Solar PhotovoltaicSolar1.4 MWOperating2023

Grid context

NERC RegionRFC
Balancing AuthorityPJM Interconnection, LLC

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Frederick County

View all plants in Frederick County →

Data centers near The Village at Orchard Ridge (TVOR)

Data centerOperatorDistance
Middletown Data CenterNot recorded13.4 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more