Electric generating plantEIA plant no. 61269

Thunder Ranch Wind Project

Type
Onshore Wind Turbine
Nameplate capacity
298 MW
Units
1
In service since
2017
Operator
Thunder Ranch Wind Project, LLC
Location
Marland, Noble County, Oklahoma
Rated 34th largest in Oklahoma · 1129th of 14,761 in the U.S. · by nameplate

Thunder Ranch Wind Project is a wind power plant in Oklahoma with a nameplate capacity of 298 MW. It generates roughly 977.6k MWh per year — enough to power about 93,109 average U.S. homes.

Its capacity factor of 37% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Thunder Ranch Wind Project could make 2.6M MWh. In 2023 it made 977.6k MWh — the same as running at full power 37 hours in every 100.

Nameplate, full year2.6M MWh298 MW × 8,760 hours
Actually generated977.6k MWhEPA eGRID, 2023 · ≈93,109 homes

Peaking or variableCapacity factor 37%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasCoalHydroelectricWind

Location

Address12650 Badlands
CityMarland
CountyNoble County
StateOklahoma
ZIP74644
Coordinates36.52200, -97.14500
OperatorThunder Ranch Wind Project, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WT1Onshore Wind TurbineWind298 MWOperating2017

Grid context

NERC RegionMRO
Balancing AuthoritySouthwest Power Pool

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Noble County

View all plants in Noble County →

Explore more