Timberland Solar is a solar power plant in Georgia.
| Plant Name | Timberland Solar |
|---|---|
| Operator | Consolidated Edison Development Inc. |
| City | Carlton |
| County | Oglethorpe County |
| State | Georgia |
| ZIP | 30627 |
| Coordinates | 33.96432, -82.81584 |
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| ID | Technology | Fuel | Capacity | Status | Online |
|---|---|---|---|---|---|
| TSPV | Solar Photovoltaic | Solar | 140 MW | Under Construction | — |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Southeastern Power Administration |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.