Tinker (Nc)

☀ SolarIPP Non-CHP4 MW capacity

625th largest plant in North Carolina · 7981st nationally

Tinker (Nc) is a solar power plant in North Carolina with a nameplate capacity of 4.8 MW. It generates roughly 7.1k MWh per year — enough to power about 679 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%17%
Peaking — intermittent or backup
Capacity5 MWnameplate
Annual Generation7.1k MWhEPA eGRID
Capacity Factor17%of theoretical max
Annual CO₂metric tons

Location

Plant NameTinker (Nc)
OperatorStrata Manager, Llc
CityMoncure
CountyChatham County
StateNorth Carolina
ZIP27559
Coordinates35.68827, -79.13692

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

NuclearNatural GasCoalHydroelectricSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
TINKRSolar PhotovoltaicSolar4.8 MWOperating2018

Ownership

OwnerLocationShare
Tinker Farm, LlcDurham, NC10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Progress East

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Chatham County

View all plants in Chatham County →

Explore more