Electric generating plantEIA plant no. 64603

TPE King Solar Holdings1, LLC (CSG)

Type
Solar Photovoltaic
Nameplate capacity
12.7 MW
Units
1
In service since
2022
Operator
Nautilus Solar Solutions
Location
North Smithfield, Providence County, Rhode Island
Rated 15th largest in Rhode Island · 5750th of 14,761 in the U.S. · by nameplate

TPE King Solar Holdings1, LLC (CSG) is a solar power plant in Rhode Island with a nameplate capacity of 12.7 MW. It generates roughly 19.3k MWh per year — enough to power about 1,840 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, TPE King Solar Holdings1, LLC (CSG) could make 111.3k MWh. In 2023 it made 19.3k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year111.3k MWh12.7 MW × 8,760 hours
Actually generated19.3k MWhEPA eGRID, 2023 · ≈1,840 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolar

Location

AddressOld Oxford Rd North
CityNorth Smithfield
CountyProvidence County
StateRhode Island
ZIP02896
Coordinates41.97921, -71.58131
OperatorNautilus Solar Solutions

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
KING1Solar PhotovoltaicSolar12.7 MWOperating2022

Grid context

NERC RegionNPCC
Balancing AuthorityISO New England Inc.