Twin Buttes Ii Wind

🌬 WindIPP Non-CHP75 MW capacity

61st largest plant in Colorado · 2940th nationally

Twin Buttes Ii Wind is a wind power plant in Colorado with a nameplate capacity of 75.0 MW. It generates roughly 283.8k MWh per year — enough to power about 27,024 average U.S. homes.

Its capacity factor of 43% puts it in the middle range — running steadily but not full-time.

PeakingMid-meritBaseload0%40%80%100%43%
Mid-merit — steady but not full-time
Capacity75 MWnameplate
Annual Generation283.8k MWhEPA eGRID
Capacity Factor43%of theoretical max
Annual CO₂metric tons

Location

Plant NameTwin Buttes Ii Wind
OperatorAvangrid Power Llc
CityLamar
CountyProwers County
StateColorado
ZIP81052
Coordinates37.77300, -102.54600

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Wind

Generators (1)

IDTechnologyFuelCapacityStatusOnline
WT1Onshore Wind TurbineWind75.0 MWOperating2017

Grid context

NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Prowers County

View all plants in Prowers County →