Veyo Heat Recovery Project is a other fossil power plant in Utah with a nameplate capacity of 9.5 MW. It generates roughly 45.8k MWh per year — enough to power about 4,358 average U.S. homes.
Its capacity factor of 55% puts it in the middle range — running steadily but not full-time.
Run flat out every hour of the year, Veyo Heat Recovery Project could make 83.2k MWh. In 2023 it made 45.8k MWh — the same as running at full power 55 hours in every 100.
Mid-meritCapacity factor 55%. It runs much of the time, but not all of it.
How it works
Why the numbers look like this: a boiler and turbine this size take hours to bring up from cold, so steam plants were built to run steadily for long stretches. A steam plant with a low capacity factor is usually being held in reserve, or run only through the hottest and coldest weeks.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 145 W. 1400 N |
|---|---|
| City | Gunlock |
| County | Washington County |
| State | Utah |
| ZIP | 84733 |
| Coordinates | 37.34800, -113.76500 |
| Operator | Utah Associated Mun Power Sys |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| WHR1 | All Other | WH | 9.5 MW | Operating | 2016 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | PacifiCorp - East |
Veyo Heat Recovery Project is a federally registered power generation facility in Utah.
| Data center | Distance |
|---|---|
| ValorC3 data center, Saint George | 20.4 mi |
| Lumen | 23.1 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map