Victory Pass

☀ SolarIPP Non-CHP250 MW capacity

94th largest plant in California · 1221st nationally

Victory Pass is a solar power plant in California with a nameplate capacity of 250 MW.

Capacity250 MWnameplate
Annual GenerationEPA eGRID
Capacity Factor
Annual CO₂metric tons

Location

Plant NameVictory Pass
OperatorVictory Pass I, Llc
CityDesert Center
CountyRiverside County
StateCalifornia
ZIP92239
Coordinates33.70100, -115.31629

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

SolarBattery Storage

Generators (2)

IDTechnologyFuelCapacityStatusOnline
VCTPVSolar PhotovoltaicSolar200 MWOperating2024
VCTBABatteriesBattery50.0 MWOperating2024

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Riverside County

View all plants in Riverside County →

Explore more