Vineland Mays Landing Solar is a solar power plant in New Jersey with a nameplate capacity of 4.0 MW. It generates roughly 6.7k MWh per year — enough to power about 642 average U.S. homes.
Its capacity factor of 19% reflects intermittent or peaking operation.
Run flat out every hour of the year, Vineland Mays Landing Solar could make 35.0k MWh. In 2023 it made 6.7k MWh — the same as running at full power 19 hours in every 100.
Peaking or variableCapacity factor 19%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3042 Mays Landing Road |
|---|---|
| City | Millville |
| County | Cumberland County |
| State | New Jersey |
| ZIP | 08332 |
| Coordinates | 39.41750, -74.97389 |
| Operator | NJR Clean Energy Ventures Corporation |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| VNLND | Solar Photovoltaic | Solar | 4.0 MW | Operating | 2011 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| DataOne Vineland | 2.4 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map