Electric generating plantEIA plant no. 58509

Vintner Solar

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2014
Operator
Ecos Energy LLC
Location
Templeton, San Luis Obispo County, California
Rated 1542nd largest in California · 12718th of 14,761 in the U.S. · by nameplate

Vintner Solar is a solar power plant in California with a nameplate capacity of 1.5 MW. It generates roughly 3.9k MWh per year — enough to power about 368 average U.S. homes.

Its capacity factor of 29% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Vintner Solar could make 13.1k MWh. In 2023 it made 3.9k MWh — the same as running at full power 29 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated3.9k MWhEPA eGRID, 2023 · ≈368 homes

Peaking or variableCapacity factor 29%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

HydroelectricSolar

Location

Address1030 El Pomar Drive
CityTempleton
CountySan Luis Obispo County
StateCalifornia
ZIP93465
Coordinates35.55795, -120.68287
OperatorEcos Energy LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV4Solar PhotovoltaicSolar1.5 MWOperating2014

Grid context

NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in San Luis Obispo County

View all plants in San Luis Obispo County →

Data centers near Vintner Solar

Data centerOperatorDistance
Digital West Data CenterNot recorded21.0 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more