Walnut Springs Solar is a solar power plant in Texas with a nameplate capacity of 5.0 MW. It generates roughly 10.9k MWh per year — enough to power about 1,040 average U.S. homes.
Its capacity factor of 25% reflects intermittent or peaking operation.
Run flat out every hour of the year, Walnut Springs Solar could make 43.8k MWh. In 2023 it made 10.9k MWh — the same as running at full power 25 hours in every 100.
Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 563 Farm Road 203 |
|---|---|
| City | Walnut Springs |
| County | Bosque County |
| State | Texas |
| ZIP | 76690 |
| Coordinates | 32.07868, -97.76846 |
| Operator | Cypress Creek Renewables |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | Solar | 5.0 MW | Operating | 2016 |
| NERC Region | TRE |
|---|---|
| Balancing Authority | Electric Reliability Council of Texas, Inc. |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| MARA Data Center | 18.4 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map