Walter C Beckjord is a other fossil power plant in Ohio with a nameplate capacity of 4.0 MW.
The 4.0 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 757 US Rt 52 |
|---|---|
| City | New Richmond |
| County | Clermont County |
| State | Ohio |
| ZIP | 45200 |
| Coordinates | 38.99170, -84.29810 |
| Operator | Duke Energy Ohio Inc |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| BECK1 | Batteries | Battery | 2.0 MW | Operating | 2015 |
| BECK2 | Batteries | Battery | 2.0 MW | Operating | 2015 |
| Owner | Location | Share |
|---|---|---|
| Dayton Power & Light Co | Dayton, OH | 5000.0% |
| Duke Energy Ohio Inc | Cincinnati, OH | 3750.0% |
| Columbus Southern Power Co | Canton, OH | 1250.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Walter C Beckjord is a federally registered power generation facility in Ohio.
| Data center | Distance |
|---|---|
| DartPoints Cincinnati | 13.9 mi |
| CyrusOne CIN2 | 14.1 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map