Water Strider Solar

☀ SolarIPP Non-CHP80 MW capacity

55th largest plant in Virginia · 2812th nationally

Water Strider Solar is a solar power plant in Virginia with a nameplate capacity of 80.0 MW. It generates roughly 184.2k MWh per year — enough to power about 17,538 average U.S. homes.

Its capacity factor of 26% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%26%
Peaking — intermittent or backup
Capacity80 MWnameplate
Annual Generation184.2k MWhEPA eGRID
Capacity Factor26%of theoretical max
Annual CO₂metric tons

Location

Plant NameWater Strider Solar
OperatorConsolidated Edison Development Inc.
CityNathalie
CountyHalifax County
StateVirginia
ZIP24577
Coordinates37.01637, -79.02706

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

CoalHydroelectricSolarBiomass

Generators (1)

IDTechnologyFuelCapacityStatusOnline
WSSSolar PhotovoltaicSolar80.0 MWOperating2021

Grid context

NERC RegionSERC
Balancing AuthorityPjm Interconnection, Llc

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Halifax County

View all plants in Halifax County →

Explore more