Westar Cities Solar is a solar power plant in Kansas with a nameplate capacity of 1.0 MW. It generates roughly 2.2k MWh per year — enough to power about 208 average U.S. homes.
Its capacity factor of 25% reflects intermittent or peaking operation.
Run flat out every hour of the year, Westar Cities Solar could make 8.8k MWh. In 2023 it made 2.2k MWh — the same as running at full power 25 hours in every 100.
Peaking or variableCapacity factor 25%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 3200 S Broadacres Rd |
|---|---|
| City | Hutchinson |
| County | Reno County |
| State | Kansas |
| ZIP | 67501 |
| Coordinates | 38.01940, -97.97530 |
| Operator | SoCore Energy LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | Solar | 1.0 MW | Operating | 2017 |
| Owner | Location | Share |
|---|---|---|
| SoCore 2016 ProjectCo-W1 LLC | Chicago, IL | 10000.0% |
Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.
| NERC Region | MRO |
|---|---|
| Balancing Authority | Southwest Power Pool |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.