Westmont 400a

☀ SolarIPP Non-CHP2 MW capacity

1307th largest plant in California · 9978th nationally

Westmont 400a is a solar power plant in California with a nameplate capacity of 2.3 MW. It generates roughly 3.1k MWh per year — enough to power about 297 average U.S. homes.

Its capacity factor of 15% reflects intermittent or peaking operation.

PeakingMid-meritBaseload0%40%80%100%15%
Peaking — intermittent or backup
Capacity2 MWnameplate
Annual Generation3.1k MWhEPA eGRID
Capacity Factor15%of theoretical max
Annual CO₂metric tons

Location

Plant NameWestmont 400a
OperatorAltus Power America Management, Llc
CityLos Angeles
CountyLos Angeles County
StateCalifornia
ZIP90731
Coordinates33.76423, -118.28893

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomassBattery Storage

Generators (1)

IDTechnologyFuelCapacityStatusOnline
W5691Solar PhotovoltaicSolar2.3 MWOperating2017

Ownership

OwnerLocationShare
Westmont Solar IiWestport, CT10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionWECC
Balancing AuthorityLos Angeles Department Of Water And Power

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.