Electric generating plantEIA plant no. 62715

Wildcat Creek Wind Farm LLC

Type
Onshore Wind Turbine
Nameplate capacity
175 MW
Units
1
In service since
2021
Operator
Wildcat Creek Wind Farm LLC
Location
Gainesville, Cooke County, Texas
Rated 392nd largest in Texas · 1847th of 14,761 in the U.S. · by nameplate

Wildcat Creek Wind Farm LLC is a wind power plant in Texas with a nameplate capacity of 175 MW. It generates roughly 560.1k MWh per year — enough to power about 53,342 average U.S. homes.

Its capacity factor of 36% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Wildcat Creek Wind Farm LLC could make 1.5M MWh. In 2023 it made 560.1k MWh — the same as running at full power 36 hours in every 100.

Nameplate, full year1.5M MWh175 MW × 8,760 hours
Actually generated560.1k MWhEPA eGRID, 2023 · ≈53,342 homes

Peaking or variableCapacity factor 36%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A wind farm

1wind turns the rotor2gearbox + generator in the nacelle3substation steps up voltage
  1. Wind pushes the blades, turning a rotor at a few revolutions per minute.
  2. A gearbox (or a large direct-drive generator) turns that slow spin into electricity inside the nacelle.
  3. Cables from every turbine run to a substation, which raises the voltage for the transmission lines.

Why the numbers look like this: a turbine's output rises with roughly the cube of wind speed — double the wind, about eight times the power, up to the turbine's rated limit. That's why a wind farm's month-by-month bars swing so much, and why its capacity factor lands well below its nameplate.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasWindSolarBattery Storage

Location

Address7234 Fm 1198
CityGainesville
CountyCooke County
StateTexas
ZIP76240
Coordinates33.54915, -97.32958
OperatorWildcat Creek Wind Farm LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
WCCWFOnshore Wind TurbineWind175 MWOperating2021

Grid context

NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc.

About Wind plants

Wind farms harvest kinetic energy from moving air using large rotor blades coupled to generators. Like solar, they produce zero emissions but vary with weather. Onshore wind capacity factors typically run 30–45%; offshore can exceed 50%.

Other plants in Cooke County

View all plants in Cooke County →

Explore more