Wilzig Associates, LLC is a solar power plant in New Jersey with a nameplate capacity of 1.2 MW. It generates roughly 1.4k MWh per year — enough to power about 129 average U.S. homes.
Its capacity factor of 13% reflects intermittent or peaking operation.
Run flat out every hour of the year, Wilzig Associates, LLC could make 10.5k MWh. In 2023 it made 1.4k MWh — the same as running at full power 13 hours in every 100.
Peaking or variableCapacity factor 13%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | Union Avenue & DuBois Street |
|---|---|
| City | East Rutherford |
| County | Bergen County |
| State | New Jersey |
| ZIP | 07073 |
| Coordinates | 40.82532, -74.09442 |
| Operator | Wilzig Associates, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| WILZG | Solar Photovoltaic | Solar | 1.2 MW | Operating | 2013 |
| NERC Region | RFC |
|---|---|
| Balancing Authority | PJM Interconnection, LLC |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| Digital Realty New Jersey EWR21 | 1.6 mi |
| Digital Realty New Jersey EWR20 | 1.7 mi |
| BT Radianz: 492 River Road | 2.1 mi |
| Credit Suisse: Clifton Data Center | 2.5 mi |
| H5 Secaucus | 2.9 mi |
| Evocative Secaucus | 3.0 mi |
| Centersquare NYC3 Data Center | 3.0 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map