Yellow Pine II is a solar power plant in Nevada with a nameplate capacity of 210 MW.
The 210 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 6901 Tecopa Road |
|---|---|
| City | Enterprise |
| County | Clark County |
| State | Nevada |
| ZIP | 89124 |
| Coordinates | 36.07550, -115.79129 |
| Operator | Yellow Pine Solar II, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| YP2BP | Solar Photovoltaic | Solar | 65.0 MW | Operating | 2024 |
| YP2AP | Solar Photovoltaic | Solar | 60.0 MW | Operating | 2024 |
| YP2AB | Batteries | Battery | 53.0 MW | Operating | 2024 |
| YP2BB | Batteries | Battery | 32.0 MW | Operating | 2024 |
| NERC Region | WECC |
|---|---|
| Balancing Authority | Nevada Power Company |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.