Power Plants in Austin County, Texas

Austin County, Texas has 5 power plants totaling 11 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants5operating sites
Capacity11 MWnameplate
Generation17.4k MWhannual
Solar 100%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
BovineWallisSolar10.0 MWCypress Creek Renewables
E-Volve Energy Holdings LlcSealySolar1.2 MWE-Volve Energy Holdings Llc
Sunrose Renewable EnergyWallisBattery Storage— MWVesper Energy Development Llc
Prost EssTbdBattery Storage— MWProst Ess Llc
Sealy BessSealyBattery Storage— MWSealy Power, Llc

About power generation in Austin County

Austin County, Texas has 5 power plants totaling 11 MW of nameplate capacity. Solar is the dominant fuel source at 100% of installed capacity, followed by Battery Storage (0%). The largest facility is Bovine at 10 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Austin County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.