Power Plants in Maverick County, Texas

Maverick County, Texas has 5 power plants totaling 143 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants5operating sites
Capacity143 MWnameplate
Generation43.3k MWhannual
CO₂258metric tons/year
Battery Storage 79%Other Fossil 14%Hydroelectric 7%

Plant locations

All plants in this county

PlantCityFuelNameplate capacityOperator
Fort Duncan BESSEagle PassBattery Storage103 MWFort Duncan BESS, LLC
Pueblo BAEagle PassOther Fossil19.8 MWEngie North America
Regis EscondidoEagle PassBattery Storage9.9 MWRegis Escondido LLC
Eagle PassEagle PassHydroelectric9.6 MWMaverick Cty Water Control & Improvement
Wal461Eagle PassNatural Gas1.2 MWWalmart Stores Texas, LLC

About power generation in Maverick County

Maverick County, Texas has 5 power plants totaling 143 MW of nameplate capacity. Battery Storage is the dominant fuel source at 79% of installed capacity, followed by Other Fossil (14%) and Hydroelectric (7%). The largest facility is Fort Duncan BESS at 102 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Maverick County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.