Tooele County, Utah has 3 power plants totaling 162 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Elektron Solar, LLC | Grantsville | Solar | 80.0 MW | Elektron Solar, LLC |
| Horseshoe Solar, LLC | Tooele | Solar | 75.0 MW | Horseshoe Solar, LLC |
| Tooele Army Depot(CSG) | Tooele | Wind | 7.2 MW | Tooele Army Depot |
Tooele County, Utah has 3 power plants totaling 162 MW of nameplate capacity. Solar is the dominant fuel source at 96% of installed capacity, followed by Wind (4%). The largest facility is Elektron Solar, LLC at 80 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Tooele County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.