Adams County, Washington has 4 power plants totaling 169 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Rattlesnake Flat | Ritzville | Wind | 144 MW | Rattlesnake Flat, Llc |
| Adams Nielson Solar | Lind | Solar | 19.2 MW | Strata Manager, Llc |
| Russell D Smith | Othello | Hydroelectric | 6.1 MW | Columbia Basin Hydropower |
| Saddle Mountain East Wind Farm | Othello | Wind | — MW | Edp Renewables North America Llc |
Adams County, Washington has 4 power plants totaling 169 MW of nameplate capacity. Wind is the dominant fuel source at 85% of installed capacity, followed by Solar (11%) and Hydroelectric (4%). The largest facility is Rattlesnake Flat at 144 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Adams County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.