Jefferson County, Washington has 3 power plants totaling 10 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Capacity | Operator |
|---|---|---|---|---|
| Port Townsend Paper | Port Townsend | Biomass | 7.9 MW | Port Townsend Paper Co |
| Rocky Brook Hydroelectric | Brinnon | Hydroelectric | 1.6 MW | Rocky Brook Electric Inc |
| Sinclair Bess | Gorst | Battery Storage | — MW | Sinc Bn, Llc |
Jefferson County, Washington has 3 power plants totaling 10 MW of nameplate capacity. Biomass is the dominant fuel source at 83% of installed capacity, followed by Hydroelectric (17%) and Battery Storage (0%). The largest facility is Port Townsend Paper at 7 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Jefferson County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.