Power Plants in Lewis County, Washington

Lewis County, Washington has 6 power plants totaling 1,883 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants6operating sites
Capacity1,882 MWnameplate
Generation7.9M MWhannual
CO₂6.0Mmetric tons/year
Coal 39%Natural Gas 32%Hydroelectric 30%

Plant locations

All plants in this county

PlantCityFuelNameplate capacityOperator
Transalta Centralia GenerationCentraliaCoal730 MWTransAlta Centralia Gen LLC
Chehalis Generating FacilityChehalisNatural Gas593 MWPacifiCorp
MossyrockSilver CreekHydroelectric300 MWCity of Tacoma - (WA)
MayfieldSilver CreekHydroelectric162 MWCity of Tacoma - (WA)
Cowlitz FallsRandleHydroelectric70.0 MWPUD No 1 of Lewis County - (WA)
PackwoodPackwoodHydroelectric27.5 MWEnergy Northwest - Packwood

About power generation in Lewis County

Lewis County, Washington has 6 power plants totaling 1,883 MW of nameplate capacity. Coal is the dominant fuel source at 39% of installed capacity, followed by Natural Gas (32%) and Hydroelectric (30%). The largest facility is Transalta Centralia Generation at 729 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Lewis County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.