Power Plants in Wayne County, West Virginia

Wayne County, West Virginia has 2 power plants totaling 872 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.

Plants2operating sites
Capacity872 MWnameplate
Generation794.8k MWhannual
CO₂557.2kmetric tons/year
Natural Gas 100%

Plant locations

All plants in this county

PlantCityFuelCapacityOperator
Ceredo Generating StationHuntingtonNatural Gas519 MWAppalachian Power Co
Big Sandy Peaker PlantKenonaNatural Gas353 MWMiddle River Power Ii, Llc

About power generation in Wayne County

Wayne County, West Virginia has 2 power plants totaling 872 MW of nameplate capacity. Natural Gas is the dominant fuel source at 100% of installed capacity. The largest facility is Ceredo Generating Station at 519 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.

To find plants closer to a specific address in Wayne County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.