Arapahoe County, Colorado has 21 power plants totaling 336 MW of nameplate capacity. Browse every plant below with fuel type, operator, and capacity.
| Plant | City | Fuel | Nameplate capacity | Operator |
|---|---|---|---|---|
| Canyon Peak Power Station | Bennett | Natural Gas | 157 MW | Canyon Peak Power, LLC |
| Hunter Solar, LLC (CO) | Bennett | Solar | 75.0 MW | Hunter Solar, LLC |
| Titan Solar | Deer Trail | Solar | 50.0 MW | Titan Solar, LLC |
| Pivot Solar 21 | Aurora | Solar | 5.0 MW | Pivot Energy |
| USS Tall Grass Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| USS Calico Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| USS Great Plains Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| USS Hampden Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| USS High Plains Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| USS Raptor Solar LLC | Aurora | Solar | 5.0 MW | United States Solar Corporation |
| DADS Gas Recovery | Aurora | Biomass | 3.2 MW | WM Renewable Energy LLC |
| Arapahoe 3 Community Solar Array | Aurora | Solar | 1.8 MW | MN8 Energy LLC |
| Pivot Solar 9 | Aurora | Solar | 1.7 MW | Nautilus Solar Solutions |
| Pivot Solar 10 | Aurora | Solar | 1.7 MW | Nautilus Solar Solutions |
| Quincy II Solar Garden | Aurora | Solar | 1.5 MW | Onsite Partners, LLC |
| Oak Leaf Solar XXI (CSG) | Watkins | Solar | 1.5 MW | Greenbacker Renewable Energy Corporation |
| Oak Leaf Solar XXV LLC (CSG) | Watkins | Solar | 1.5 MW | Greenbacker Renewable Energy Corporation |
| Oak Leaf Solar XXIV LLC (CSG) | Watkins | Solar | 1.5 MW | Greenbacker Renewable Energy Corporation |
| Quincy Solar (CO) | Watkins | Solar | 1.5 MW | Terraform Arcadia |
| Oak Leaf - CSG Portfolio (OL 36) | Watkins | Solar | 1.5 MW | Distributed Solar Development, LLC |
| Oak Leaf - CSG Portfolio (OL 39) | Watkins | Solar | 1.5 MW | Distributed Solar Development, LLC |
Arapahoe County, Colorado has 21 power plants totaling 336 MW of nameplate capacity. Solar is the dominant fuel source at 52% of installed capacity, followed by Natural Gas (47%) and Biomass (1%). The largest facility is Canyon Peak Power Station at 156 MW. Data comes from EIA Form 860, EIA Form 923, and EPA eGRID federal releases.
To find plants closer to a specific address in Arapahoe County, use the address lookup — it shows every plant within a chosen radius along with distance, fuel type, and emissions.