Electric generating plantEIA plant no. 61752

Quincy II Solar Garden

Type
Solar Photovoltaic
Nameplate capacity
1.5 MW
Units
1
In service since
2018
Operator
Onsite Partners, LLC
Location
Aurora, Arapahoe County, Colorado
Rated 249th largest in Colorado · 12718th of 14,761 in the U.S. · by nameplate

Quincy II Solar Garden is a solar power plant in Colorado with a nameplate capacity of 1.5 MW. It generates roughly 2.2k MWh per year — enough to power about 211 average U.S. homes.

Its capacity factor of 17% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Quincy II Solar Garden could make 13.1k MWh. In 2023 it made 2.2k MWh — the same as running at full power 17 hours in every 100.

Nameplate, full year13.1k MWh1.5 MW × 8,760 hours
Actually generated2.2k MWhEPA eGRID, 2023 · ≈211 homes

Peaking or variableCapacity factor 17%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Location

Address28102 E Quincy Ave
CityAurora
CountyArapahoe County
StateColorado
ZIP80127
Coordinates39.63841, -104.66251
OperatorOnsite Partners, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
PV1Solar PhotovoltaicSolar1.5 MWOperating2018

Grid context

NERC RegionWECC
Balancing AuthorityPublic Service Company of Colorado

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Arapahoe County

View all plants in Arapahoe County →

Data centers near Quincy II Solar Garden

Data centerOperatorDistance
Xfinity/Comcast Data CenterNot recorded9.7 mi
EdgeConneX - DEN01EdgeConneX10.3 mi
EdgeConnex - DEN02EdgeConneX10.3 mi
CSquare - DEN2Csquare10.4 mi
US Signal - CO01US Signal10.6 mi
Flexential Denver - EnglewoodFlexential10.8 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more