AT&T data center, 216 East Washington Street, Kirksville is a data center in Kirksville, Adair County, Missouri. It is mapped as 1 building covering about 8,400 sq ft. Its power comes off the Mid-Mississippi grid (MISO (Midcontinent ISO)), which runs on 51% coal, 17% natural gas and 16% nuclear.
This data centerOther data centersPower plants (colored by fuel)
| Address | 216 East Washington Street, Kirksville MO 63501 |
|---|---|
| County | Adair County, Missouri |
| Coordinates | 40.19444, -92.58130 |
| On OpenStreetMap | way/642755041 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Mid-Mississippi grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 51% coal, 17% natural gas, 16% nuclear and 13% wind.
Each megawatt-hour carried about 1,238 lb of CO₂, 62% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Mid-Mississippi grid region (SRMW) in 2023, from eGRID. 106 TWh from 243 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Union Electric Co - (MO) | 9.7¢ | 7.6¢ |
| Macon Electric Coop | 13.1¢ | 7.2¢ |
Utilities that report serving Adair County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Morris Solar | Solar | 250 MW | 3.1 mi |
| La Plata | Oil | 3.6 MW | 12.7 mi |
| High Prairie Wind Farm | Wind | 400 MW | 14.5 mi |
| Memphis | Oil | 8.8 MW | 27.9 mi |
| Unionville | Oil | 53.2 MW | 29.6 mi |
| Unionville City of | Oil | 8.7 MW | 29.8 mi |
| Macon Solar Power Project | Solar | 2.8 MW | 30.7 mi |
| Macon | Oil | 1.0 MW | 32.1 mi |
| Macon Energy Center | Natural Gas | 10.0 MW | 32.5 mi |
| Bloomfield | Natural Gas | 8.5 MW | 36.1 mi |
The largest power plant within 50 miles is Thomas Hill, a 1,182 MW coal plant 44 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.