Atlantic.net data center, Maitland

Atlantic.net data center, Maitland is a data center in Maitland, Orange County, Florida. Its power comes off the Florida grid (Florida Power & Light), which runs on 75% natural gas, 12% nuclear and 5% solar.

OperatorAtlantic.netas mapped
Grid CO₂782 lbper MWh, FRCC region
Nearest plant3.5 miAltamonte Mall

Location

This data centerOther data centersPower plants (colored by fuel)

CountyOrange County, Florida
Coordinates28.61807, -81.39326
On OpenStreetMapnode/14311071437

What powers Atlantic.net data center, Maitland

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Florida grid region, and the county's largest utility is on the Florida Power & Light grid. In 2023, the region's electricity was 75% natural gas, 12% nuclear, 5% solar and 5% coal.

Each megawatt-hour carried about 782 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 75%Nuclear 12%Solar 5%Coal 5%

Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.

Utilities that serve Orange County

UtilityTypeGridBusiness rateIndustrial rate
Florida Power & Light CoInvestor OwnedFlorida Power & Light10.8¢8.0¢
Duke Energy Florida, LLCInvestor OwnedDuke Energy Florida12.3¢9.7¢
Orlando Utilities CommMunicipalFlorida Municipal Power Pool8.6¢—
City of Winter Park - (FL)MunicipalDuke Energy Florida9.6¢—
Central Florida Tourism Oversight DistrictMunicipalDuke Energy Florida9.4¢—

Utilities that report serving Orange County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Altamonte MallSolar1.5 MW3.5 mi
Lockheed Martin SolarSolar4.9 MW12.0 mi
Orlando Cogen LPNatural Gas122 MW12.2 mi
RP-Orlando, LLCSolar5.1 MW15.6 mi
SanfordNatural Gas2,378 MW16.0 mi
ACE-Stanton PVSolar4.8 MW16.2 mi
ACE-Stanton A PVSolar4.1 MW16.2 mi
Curtis H Stanton Energy CenterNatural Gas688 MW16.4 mi
Stanton Energy CenterCoal1,262 MW16.6 mi
Mount Dora Solar Farm WSolar1.9 MW18.5 mi

The largest power plant within 50 miles is Sanford, a 2,378 MW natural gas plant 16 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
HostDime data center, MaitlandHostDime2.5 ac0.0 mi

More

Data centers in Florida · Data centers in Orange County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me