3 data centers are mapped in Orange County, Florida: 3 buildings covering about 2.7 acres (116,000 sq ft) of roof. Operators include Atlantic.net, HostDime. The county is in EPA's Florida grid region, whose electricity is 75% natural gas, 12% nuclear and 5% solar, at 782 lb of CO₂ per megawatt-hour.

Sites3mapped data centers
Buildings3mapped footprints
Roof area2.7 acbuilding footprints
GridFlorida Power & Lightlargest utility's grid

Map

Data centerUnder constructionPower plant (colored by fuel)

Data centers in Orange County

Data centerOperatorCityRoof area
HostDime data center, MaitlandHostDimeMaitland2.5 ac
E-FoamOperator not recordedWinter Garden0.2 ac
Atlantic.net data center, MaitlandAtlantic.netMaitland—

What the grid here generates

Data centers in Orange County draw from the regional grid. In 2023, electricity in EPA's Florida region was 75% natural gas, 12% nuclear, 5% solar and 5% coal, at 782 lb of CO₂ per megawatt-hour, close to the U.S. grid as a whole (765 lb).

Natural Gas 75%Nuclear 12%Solar 5%Coal 5%

Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.

Utilities that serve Orange County

UtilityTypeGridBusiness rateIndustrial rate
Florida Power & Light CoInvestor OwnedFlorida Power & Light10.8¢8.0¢
Duke Energy Florida, LLCInvestor OwnedDuke Energy Florida12.3¢9.7¢
Orlando Utilities CommMunicipalFlorida Municipal Power Pool8.6¢—
City of Winter Park - (FL)MunicipalDuke Energy Florida9.6¢—
Central Florida Tourism Oversight DistrictMunicipalDuke Energy Florida9.4¢—

Utilities that report serving Orange County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Power plants in Orange County

PlantFuelCapacity
Stanton Energy CenterCoal1,262 MW
Curtis H Stanton Energy CenterNatural Gas688 MW
Orlando Cogen LPNatural Gas122 MW
Taylor Creek SolarSolar74.5 MW
Citrus Ridge SolarSolar52.0 MW
RP-Orlando, LLCSolar5.1 MW
Walt Disney World Solar FacilitySolar4.9 MW
Lockheed Martin SolarSolar4.9 MW
ACE-Stanton PVSolar4.8 MW
ACE-Stanton A PVSolar4.1 MW

All power plants in Orange County →

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me