Citrus Ridge Solar is a solar power plant in Florida with a nameplate capacity of 52.0 MW. It generates roughly 69.3k MWh per year — enough to power about 6,602 average U.S. homes.
Its capacity factor of 15% reflects intermittent or peaking operation.
Run flat out every hour of the year, Citrus Ridge Solar could make 455.5k MWh. In 2023 it made 69.3k MWh — the same as running at full power 15 hours in every 100.
Peaking or variableCapacity factor 15%. It runs only part of the time — when demand is high, or when the wind or sun allows.
How it works
Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.
This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.
| Address | 351 Old Hartzog Road |
|---|---|
| City | Bay Lake |
| County | Orange County |
| State | Florida |
| ZIP | 34787 |
| Coordinates | 28.40078, -81.61632 |
| Operator | FL Solar 5, LLC |
| ID | Technology | Fuel | Nameplate capacity | Status | Online |
|---|---|---|---|---|---|
| FL501 | Solar Photovoltaic | Solar | 52.0 MW | Operating | 2018 |
| NERC Region | SERC |
|---|---|
| Balancing Authority | Duke Energy Florida Inc |
Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.
| Data center | Distance |
|---|---|
| E-Foam | 12.6 mi |
| Data center, 16182 Commonwealth Avenue North, Polk City | 15.2 mi |
Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map