Data center, 16182 Commonwealth Avenue North, Polk City is a data center in Polk City, Polk County, Florida. It is mapped as 1 building covering about 22,500 sq ft. Its power comes off the Florida grid (Duke Energy Florida), which runs on 75% natural gas, 12% nuclear and 5% solar.
This data centerOther data centersPower plants (colored by fuel)
| Address | 16182 Commonwealth Avenue North, Polk City FL 33868 |
|---|---|
| County | Polk County, Florida |
| Coordinates | 28.29403, -81.83486 |
| On OpenStreetMap | way/1034230196 |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Florida grid region, and the county's largest utility is on the Duke Energy Florida grid. In 2023, the region's electricity was 75% natural gas, 12% nuclear, 5% solar and 5% coal.
Each megawatt-hour carried about 782 lb of CO₂, close to the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Duke Energy Florida, LLC | 12.3¢ | 9.7¢ |
| Tampa Electric Co | 10.7¢ | 8.0¢ |
| Withlacoochee River Elec Coop | 10.9¢ | 5.4¢ |
| City of Lakeland - (FL) | 9.5¢ | 7.3¢ |
| Peace River Electric Coop, Inc | 10.7¢ | 22.9¢ |
| City of Bartow - (FL) | 9.5¢ | 10.1¢ |
Utilities that report serving Polk County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Citrus Ridge Solar | Solar | 52.0 MW | 15.2 mi |
| C D McIntosh Jr | Natural Gas | 666 MW | 15.7 mi |
| Cutrale Citrus Juices USA II | Natural Gas | 8.2 MW | 16.7 mi |
| Osprey Energy Center Power Plant | Natural Gas | 644 MW | 16.8 mi |
| Walt Disney World Solar Facility | Solar | 4.9 MW | 17.4 mi |
| Intercession City | Natural Gas | 1,197 MW | 17.6 mi |
| Larsen Memorial | Natural Gas | 134 MW | 17.8 mi |
| Cane Island | Natural Gas | 706 MW | 18.4 mi |
| Lkl Blbd, LLC | Solar | 6.0 MW | 19.3 mi |
| Juniper Solar (FL) | Solar | 70.0 MW | 21.0 mi |
The largest power plant within 50 miles is Sanford, a 2,378 MW natural gas plant 49 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.