Blockfusion data center, 1999 Frontier Avenue, Niagara Falls

Blockfusion data center, 1999 Frontier Avenue, Niagara Falls is a data center in Niagara Falls, Niagara County, New York. It is mapped as 1 building covering about 16,100 sq ft. Its power comes off the Upstate New York grid (New York ISO), which runs on 33% hydroelectric, 32% nuclear and 25% natural gas.

OperatorBlockfusionas mapped
Roof area0.4 ac1 building
Grid CO₂241 lbper MWh, NYUP region
Nearest plant3.1 miReworld Niagara I

Location

This data centerOther data centersPower plants (colored by fuel)

Address1999 Frontier Avenue, Niagara Falls NY 14304
CountyNiagara County, New York
Coordinates43.07489, -78.94479
Opened2019 (as mapped)
On OpenStreetMapway/832622369

What powers Blockfusion data center, 1999 Frontier Avenue, Niagara Falls

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upstate New York grid region, and the county's largest utility is on the New York ISO grid. In 2023, the region's electricity was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind.

Each megawatt-hour carried about 241 lb of CO₂, 69% cleaner than the U.S. grid as a whole (765 lb).

Hydroelectric 33%Nuclear 32%Natural Gas 25%Wind 6%Solar 2%

Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.

Utilities that serve Niagara County

UtilityTypeGridBusiness rateIndustrial rate
Niagara Mohawk Power Corp.Investor OwnedNew York ISO10.4¢6.0¢
New York State Elec & Gas CorpInvestor OwnedNew York ISO15.0¢12.5¢

Utilities that report serving Niagara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Reworld Niagara IBiomass50.0 MW3.1 mi
NY Grand Island 871 Whitehaven Rd SolarSolar5.0 MW3.5 mi
LR Wheatfield Solar 1Solar5.0 MW3.6 mi
Comfort CSGSolar4.0 MW4.3 mi
Niagara Depot SolarSolar3.5 MW4.4 mi
World Generation XNatural Gas65.7 MW4.9 mi
Corning Riverview (CSG)Solar5.0 MW5.3 mi
WheatfieldSolar4.0 MW5.8 mi
AES Tonawanda Solar LLCSolar2.0 MW5.8 mi
DG CS NY TownlineSolar5.0 MW6.0 mi

The largest power plant within 50 miles is Robert Moses Niagara, a 2,429 MW hydroelectric plant 7 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Blockfusion Niagra FallsOperator not recorded0.9 ac3.0 mi
US Bitcoin data center, Niagara FallsUS Bitcoin1.4 ac4.4 mi

More

Data centers in New York · Data centers in Niagara County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me