Blockfusion Niagra Falls is a data center in Niagara Falls, Niagara County, New York. It is mapped as 11 buildings covering about 39,100 sq ft. Its power comes off the Upstate New York grid (New York ISO), which runs on 33% hydroelectric, 32% nuclear and 25% natural gas.
This data centerOther data centersPower plants (colored by fuel)
| Address | 5380 Frontier Avenue, Niagara Falls NY 14304 |
|---|---|
| County | Niagara County, New York |
| Coordinates | 43.08281, -79.00330 |
| On OpenStreetMap | way/832656125, way/832656868, way/832658041, way/1229749890, way/1229749891, way/1229749892 and 5 more |
A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upstate New York grid region, and the county's largest utility is on the New York ISO grid. In 2023, the region's electricity was 33% hydroelectric, 32% nuclear, 25% natural gas and 6% wind.
Each megawatt-hour carried about 241 lb of CO₂, 69% cleaner than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Upstate New York grid region (NYUP) in 2023, from eGRID. 85.7 TWh from 687 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Niagara Mohawk Power Corp. | 10.4¢ | 6.0¢ |
| New York State Elec & Gas Corp | 15.0¢ | 12.5¢ |
Utilities that report serving Niagara County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Reworld Niagara I | Biomass | 50.0 MW | 0.1 mi |
| Niagara Depot Solar | Solar | 3.5 MW | 2.5 mi |
| Pivot Niagara Solar | Solar | 3.0 MW | 3.8 mi |
| Lewiston Niagara | Hydroelectric | 240 MW | 4.3 mi |
| Robert Moses Niagara | Hydroelectric | 2,429 MW | 4.5 mi |
| Comfort CSG | Solar | 4.0 MW | 4.7 mi |
| LR Wheatfield Solar 1 | Solar | 5.0 MW | 5.2 mi |
| NY Grand Island 871 Whitehaven Rd Solar | Solar | 5.0 MW | 5.7 mi |
| Corning Riverview (CSG) | Solar | 5.0 MW | 7.2 mi |
| AES Tonawanda Solar LLC | Solar | 2.0 MW | 7.8 mi |
The largest power plant within 50 miles is Robert Moses Niagara, a 2,429 MW hydroelectric plant 5 miles away.
Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.
| Data center | Roof area | Distance |
|---|---|---|
| US Bitcoin data center, Niagara Falls | 1.4 ac | 1.4 mi |
| Blockfusion data center, 1999 Frontier Avenue, Niagara Falls | 0.4 ac | 3.0 mi |
Data centers in New York · Data centers in Niagara County · U.S. data center map
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.