Cipher Black Pearl Data Center

Cipher Black Pearl Data Center is a data center run by Cipher Digital Inc. in Wink, Winkler County, Texas. It is mapped as 1 building covering about 4.4 acres (191,000 sq ft). Its power comes off the Texas (ERCOT) grid, which runs on 50% natural gas, 23% wind and 13% coal.

OperatorCipher Digital Inc.as mapped
Roof area4.4 ac1 building
Grid CO₂733 lbper MWh, ERCT region
Nearest plant9.6 miPermian Basin

Location

This data centerOther data centersPower plants (colored by fuel)

Address11786 County Road 209, Wink TX 79789
CountyWinkler County, Texas
Coordinates31.68947, -103.06873
Websitewww.datacentermap.com/usa/texas/kermit/cipher-black-pearl/
On OpenStreetMapway/1575979078

What powers Cipher Black Pearl Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Texas (ERCOT) grid region. In 2023, the region's electricity was 50% natural gas, 23% wind, 13% coal and 9% nuclear.

Each megawatt-hour carried about 733 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 50%Wind 23%Coal 13%Nuclear 9%Solar 6%

Share of electricity generated in EPA's Texas (ERCOT) grid region (ERCT) in 2023, from eGRID. 477 TWh from 749 plants.

Nearest power plants

PlantFuelCapacityDistance
Permian BasinNatural Gas447 MW9.6 mi
Rattlesnake (TX)Other Fossil9.9 MW12.5 mi
LonestarOther Fossil9.9 MW12.5 mi
Phoebe SolarSolar250 MW15.9 mi
Pyote GasNatural Gas10.0 MW16.4 mi
Swoose IOther Fossil9.9 MW16.6 mi
Oberon IASolar150 MW21.6 mi
Oberon IBSolar30.0 MW21.8 mi
Swift Air Solar ISolar145 MW22.6 mi
Non-PLD US-El Paso - BSSAT004Battery Storage9.9 MW22.7 mi

The largest power plant within 50 miles is Odessa-Ector Power Plant, a 1,153 MW natural gas plant 45 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

More

Data centers in Texas · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me