Data center, 2802 Sylvan Avenue, Madison

Data center, 2802 Sylvan Avenue, Madison is a data center in Madison, Dane County, Wisconsin. It is mapped as 1 building covering about 9,100 sq ft. Its power comes off the Upper Midwest East grid (MISO (Midcontinent ISO)), which runs on 43% natural gas, 39% coal and 5% wind.

OperatorOperator not recordedas mapped
Roof area0.2 ac1 building
Grid CO₂1,397 lbper MWh, MROE region
Nearest plant0.8 miWest Campus Cogeneration …

Location

This data centerOther data centersPower plants (colored by fuel)

Address2802 Sylvan Avenue, Madison WI 53705
CountyDane County, Wisconsin
Coordinates43.06730, -89.43664
On OpenStreetMapway/447803368

What powers Data center, 2802 Sylvan Avenue, Madison

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest East grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 43% natural gas, 39% coal, 5% wind and 5% solar.

Each megawatt-hour carried about 1,397 lb of CO₂, 82% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 43%Coal 39%Wind 5%Solar 5%Hydroelectric 4%Biomass 3%

Share of electricity generated in EPA's Upper Midwest East grid region (MROE) in 2023, from eGRID. 24.5 TWh from 124 plants.

Utilities that serve Dane County

UtilityTypeGridBusiness rateIndustrial rate
Wisconsin Electric Power CoInvestor OwnedMISO (Midcontinent ISO)13.8¢9.3¢
Wisconsin Power & Light CoInvestor OwnedMISO (Midcontinent ISO)12.8¢8.9¢
Madison Gas & Electric CoInvestor OwnedMISO (Midcontinent ISO)13.8¢9.2¢
Adams-Columbia Electric CoopCooperativeMISO (Midcontinent ISO)12.9¢9.2¢
Sun Prairie UtilitiesMunicipalMISO (Midcontinent ISO)10.2¢8.2¢
City of Stoughton - (WI)MunicipalMISO (Midcontinent ISO)10.6¢9.2¢
Rock Energy CooperativeCooperativeMISO (Midcontinent ISO)10.6¢5.5¢
Village of Waunakee - (WI)MunicipalMISO (Midcontinent ISO)10.8¢8.4¢
Village of Mt. Horeb - (WI)MunicipalMISO (Midcontinent ISO)12.0¢—

Utilities that report serving Dane County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
West Campus Cogeneration FacilityNatural Gas169 MW0.8 mi
UW Madison Charter Street PlantNatural Gas11.0 MW1.8 mi
Capitol Heat and PowerOil2.0 MW3.1 mi
Blount StreetNatural Gas100 MW3.2 mi
Diesel GeneratorsOil54.0 MW3.2 mi
Blount BESSBattery Storage7.0 MW3.3 mi
FitchburgNatural Gas57.6 MW3.8 mi
Nine SpringsNatural Gas16.2 MW4.4 mi
O'Brien Solar FieldsSolar22.1 MW4.9 mi
Galactic WindWind9.9 MW5.8 mi

The largest power plant within 50 miles is Columbia (WI), a 1,112 MW coal plant 29 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Lumen Madison 1 Data CenterLumen Technologies—2.2 mi

More

Data centers in Wisconsin · Data centers in Dane County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me