Lumen Madison 1 Data Center is a data center run by Lumen Technologies in Madison, Dane County, Wisconsin. Its power comes off the Upper Midwest East grid (MISO (Midcontinent ISO)), which runs on 43% natural gas, 39% coal and 5% wind.

OperatorLumen Technologiesas mapped
Grid CO₂1,397 lbper MWh, MROE region
Nearest plant0.5 miUW Madison Charter Street…

Location

This data centerOther data centersPower plants (colored by fuel)

CountyDane County, Wisconsin
Coordinates43.06772, -89.39228
On OpenStreetMapnode/13226718075

What powers Lumen Madison 1 Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Upper Midwest East grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 43% natural gas, 39% coal, 5% wind and 5% solar.

Each megawatt-hour carried about 1,397 lb of CO₂, 82% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Natural Gas 43%Coal 39%Wind 5%Solar 5%Hydroelectric 4%Biomass 3%

Share of electricity generated in EPA's Upper Midwest East grid region (MROE) in 2023, from eGRID. 24.5 TWh from 124 plants.

Utilities that serve Dane County

UtilityTypeGridBusiness rateIndustrial rate
Wisconsin Electric Power CoInvestor OwnedMISO (Midcontinent ISO)13.8¢9.3¢
Wisconsin Power & Light CoInvestor OwnedMISO (Midcontinent ISO)12.8¢8.9¢
Madison Gas & Electric CoInvestor OwnedMISO (Midcontinent ISO)13.8¢9.2¢
Adams-Columbia Electric CoopCooperativeMISO (Midcontinent ISO)12.9¢9.2¢
Sun Prairie UtilitiesMunicipalMISO (Midcontinent ISO)10.2¢8.2¢
City of Stoughton - (WI)MunicipalMISO (Midcontinent ISO)10.6¢9.2¢
Rock Energy CooperativeCooperativeMISO (Midcontinent ISO)10.6¢5.5¢
Village of Waunakee - (WI)MunicipalMISO (Midcontinent ISO)10.8¢8.4¢
Village of Mt. Horeb - (WI)MunicipalMISO (Midcontinent ISO)12.0¢—

Utilities that report serving Dane County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
UW Madison Charter Street PlantNatural Gas11.0 MW0.5 mi
Capitol Heat and PowerOil2.0 MW1.1 mi
Blount StreetNatural Gas100 MW1.2 mi
Blount BESSBattery Storage7.0 MW1.2 mi
Diesel GeneratorsOil54.0 MW1.2 mi
West Campus Cogeneration FacilityNatural Gas169 MW1.7 mi
Nine SpringsNatural Gas16.2 MW2.6 mi
Galactic WindWind9.9 MW3.8 mi
FitchburgNatural Gas57.6 MW5.0 mi
Sycamore (WI)Natural Gas41.6 MW5.1 mi

The largest power plant within 50 miles is Columbia (WI), a 1,112 MW coal plant 29 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, 2802 Sylvan Avenue, MadisonOperator not recorded0.2 ac2.2 mi

More

Data centers in Wisconsin · Data centers in Dane County · All Lumen Technologies data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me