Data center, Kansas City

Data center, Kansas City is a data center in Kansas City, Clay County, Missouri. It is mapped as 1 building covering about 6.2 acres (272,000 sq ft). Its power comes off the Kansas/Missouri grid (MISO (Midcontinent ISO)), which runs on 40% wind, 32% coal and 14% nuclear.

OperatorOperator not recordedas mapped
Roof area6.2 ac1 building
Grid CO₂861 lbper MWh, SPNO region
Nearest plant12.5 miQuindaro

Location

This data centerOther data centersPower plants (colored by fuel)

CountyClay County, Missouri
Coordinates39.32324, -94.57299
On OpenStreetMapway/1567486004

What powers Data center, Kansas City

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Kansas/Missouri grid region, and the county's largest utility is on the MISO (Midcontinent ISO) grid. In 2023, the region's electricity was 40% wind, 32% coal, 14% nuclear and 14% natural gas.

Each megawatt-hour carried about 861 lb of CO₂, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Wind 40%Coal 32%Nuclear 14%Natural Gas 14%

Share of electricity generated in EPA's Kansas/Missouri grid region (SPNO) in 2023, from eGRID. 73.5 TWh from 203 plants.

Utilities that serve Clay County

UtilityTypeGridBusiness rateIndustrial rate
Union Electric Co - (MO)Investor OwnedMISO (Midcontinent ISO)9.7¢7.6¢
Evergy Missouri WestInvestor OwnedSouthwest Power Pool9.6¢6.9¢
Evergy MetroInvestor OwnedSouthwest Power Pool10.4¢7.4¢
Platte-Clay Electric Coop, IncCooperativeAssociated Electric Cooperative, Inc8.9¢13.4¢

Utilities that report serving Clay County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
QuindaroOil144 MW12.5 mi
Nearman CreekCoal365 MW12.6 mi
BPU Solar FarmSolar1.0 MW12.7 mi
Northeast (MO)Oil540 MW13.9 mi
Hawthorn Solar ISolar10.0 MW13.9 mi
HawthornCoal1,046 MW14.2 mi
Grand Ave PlantNatural Gas5.0 MW14.6 mi
Jackson SquareOil36.0 MW18.0 mi
Station HNatural Gas43.0 MW18.2 mi
KCP&L SmartGrid Innovation ParkOther Fossil1.0 MW19.6 mi

The largest power plant within 50 miles is Iatan, a 1,754 MW coal plant 23 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, Kansas CityOperator not recorded7.1 ac0.3 mi
Data center, Kansas CityOperator not recorded6.9 ac0.5 mi
Data center, Kansas CityOperator not recorded8.0 ac0.9 mi
Meta Data CenterMeta21 ac1.3 mi

More

Data centers in Missouri · Data centers in Clay County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me