5 data centers are mapped in Clay County, Missouri: 7 buildings covering about 49.5 acres (2,157,000 sq ft) of roof. Operators include Meta. The county is in EPA's Kansas/Missouri grid region, whose electricity is 40% wind, 32% coal and 14% nuclear, at 861 lb of CO₂ per megawatt-hour.
Data centerUnder construction
| Data center | City | Roof area |
|---|---|---|
| Meta Data Center | Kansas City | 21 ac |
| Data center, Kansas City | Kansas City | 8.0 ac |
| Data center, Kansas City | Kansas City | 7.1 ac |
| Data center, Kansas City | Kansas City | 6.9 ac |
| Data center, Kansas City | Kansas City | 6.2 ac |
Data centers in Clay County draw from the regional grid. In 2023, electricity in EPA's Kansas/Missouri region was 40% wind, 32% coal, 14% nuclear and 14% natural gas, at 861 lb of CO₂ per megawatt-hour, 13% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Kansas/Missouri grid region (SPNO) in 2023, from eGRID. 73.5 TWh from 203 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Union Electric Co - (MO) | 9.7¢ | 7.6¢ |
| Evergy Missouri West | 9.6¢ | 6.9¢ |
| Evergy Metro | 10.4¢ | 7.4¢ |
| Platte-Clay Electric Coop, Inc | 8.9¢ | 13.4¢ |
Utilities that report serving Clay County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.