Data center, Meridianville

Data center, Meridianville is a data center in Meridianville, Madison County, Alabama. It is mapped as 1 building covering about 8.3 acres (362,000 sq ft). Its power comes off the Tennessee Valley grid (Tennessee Valley Authority), which runs on 33% nuclear, 30% natural gas and 28% coal.

OperatorOperator not recordedas mapped
Roof area8.3 ac1 building
Grid CO₂895 lbper MWh, SRTV region
Nearest plant1.5 miTAI Huntsville Solar Hybr…

Location

This data centerOther data centersPower plants (colored by fuel)

CountyMadison County, Alabama
Coordinates34.85123, -86.62701
On OpenStreetMapway/1540172612

What powers Data center, Meridianville

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Tennessee Valley grid region, and the county's largest utility is on the Tennessee Valley Authority grid. In 2023, the region's electricity was 33% nuclear, 30% natural gas, 28% coal and 8% hydroelectric.

Each megawatt-hour carried about 895 lb of CO₂, 17% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Nuclear 33%Natural Gas 30%Coal 28%Hydroelectric 8%

Share of electricity generated in EPA's Tennessee Valley grid region (SRTV) in 2023, from eGRID. 210 TWh from 171 plants.

Utilities that serve Madison County

UtilityTypeGridBusiness rateIndustrial rate
City of Huntsville - (AL)MunicipalTennessee Valley Authority11.1¢7.1¢

Utilities that report serving Madison County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
TAI Huntsville Solar HybridSolar32.4 MW1.5 mi
Cumblerland Land Holdings, LLCSolar14.7 MW15.3 mi
Redstone Arsenal HybridSolar11.0 MW16.6 mi
Elora SolarSolar150 MW21.7 mi
Decatur Energy CenterNatural Gas902 MW27.1 mi
Morgan Energy CenterNatural Gas900 MW28.8 mi
Browns FerryNuclear3,854 MW29.7 mi
Tims FordHydroelectric45.7 MW31.0 mi
Decatur-Morgan Co LFG Recovery ProjectBiomass1.6 MW31.2 mi
GuntersvilleHydroelectric115 MW32.5 mi

The largest power plant within 50 miles is Browns Ferry, a 3,854 MW nuclear plant 30 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Data center, MeridianvilleOperator not recorded6.9 ac0.5 mi
Meta Huntsville Data centerMeta41 ac0.6 mi

More

Data centers in Alabama · Data centers in Madison County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me