Electric generating plantEIA plant no. 61901

Redstone Arsenal Hybrid

Type
Solar Photovoltaic
Nameplate capacity
11.0 MW
Units
2
In service since
2017
Operator
MN8 Energy LLC
Location
Huntsville, Madison County, Alabama
Rated 72nd largest in Alabama · 5927th of 14,761 in the U.S. · by nameplate

Redstone Arsenal Hybrid is a solar power plant in Alabama with a nameplate capacity of 11.0 MW. It generates roughly 15.5k MWh per year — enough to power about 1,478 average U.S. homes.

Its capacity factor of 16% reflects intermittent or peaking operation.

On paper vs. what it actually made

each square = 1 hour at full nameplate

Run flat out every hour of the year, Redstone Arsenal Hybrid could make 96.4k MWh. In 2023 it made 15.5k MWh — the same as running at full power 16 hours in every 100.

Nameplate, full year96.4k MWh11.0 MW × 8,760 hours
Actually generated15.5k MWhEPA eGRID, 2023 · ≈1,478 homes

Peaking or variableCapacity factor 16%. It runs only part of the time — when demand is high, or when the wind or sun allows.

How it works

A solar farm

DCAC1panels turn light into DC current2inverters make AC3to the grid
  1. Silicon cells in each panel turn sunlight directly into direct current (DC). Nothing moves; nothing burns.
  2. Inverters convert DC into the alternating current (AC) the grid uses.
  3. A substation raises the voltage and sends it onto transmission lines.

Why the numbers look like this: panels make nothing at night and less in winter, so even a well-placed U.S. solar farm averages around a quarter of its nameplate over a year. Watch the monthly bars: they swell in summer and shrink in December.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasHydroelectricSolar

Location

AddressRedstone Arsenal Base
CityHuntsville
CountyMadison County
StateAlabama
ZIP35808
Coordinates34.61099, -86.61155
OperatorMN8 Energy LLC

Generators (2)

IDTechnologyFuelNameplate capacityStatusOnline
REDSTSolar PhotovoltaicSolar10.0 MWOperating2017
BABatteriesBattery1.0 MWOperating2017

Ownership

OwnerLocationShare
Regions BankBirmingham, AL10000.0%

Ownership reported to EIA Form 860. Percentages reflect reported generator-level ownership share, averaged when a plant has multiple generators.

Grid context

NERC RegionSERC
Balancing AuthorityTennessee Valley Authority

About Solar plants

Utility-scale solar farms convert sunlight directly into electricity using photovoltaic panels. They produce zero direct emissions and have no fuel cost, but generation is variable — peaking at midday and falling to zero at night. Capacity factors typically run 18–28% in good locations.

Other plants in Madison County

View all plants in Madison County →

Data centers near Redstone Arsenal Hybrid

Data centerOperatorDistance
George C. Wallace Alabama Supercomputer CenterAlabama Supercomputer Authority9.3 mi
SimpleHelixNot recorded10.3 mi
Meta Huntsville Data centerMeta16.1 mi
Data center, MeridianvilleNot recorded16.6 mi
Data center, MeridianvilleNot recorded17.1 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more