Flexential - Denver - Aurora

Flexential - Denver - Aurora is a data center in Aurora, Arapahoe County, Colorado. Its power comes off the Rocky Mountains grid (Public Service Co. of Colorado (Xcel)), which runs on 32% coal, 26% natural gas and 26% wind.

OperatorFlexentialas mapped
Grid CO₂1,036 lbper MWh, RMPA region
Nearest plant3.7 miHillcrest Pump Station

Location

This data centerOther data centersPower plants (colored by fuel)

Address11900 East Cornell Avenue, Aurora CO 80014
CountyArapahoe County, Colorado
Coordinates39.66105, -104.84883
On OpenStreetMapnode/12112270180

What powers Flexential - Denver - Aurora

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Rocky Mountains grid region, and the county's largest utility is on the Public Service Co. of Colorado (Xcel) grid. In 2023, the region's electricity was 32% coal, 26% natural gas, 26% wind and 11% hydroelectric.

Each megawatt-hour carried about 1,036 lb of CO₂, 35% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).

Coal 32%Natural Gas 26%Wind 26%Hydroelectric 11%Solar 5%

Share of electricity generated in EPA's Rocky Mountains grid region (RMPA) in 2023, from eGRID. 67.7 TWh from 310 plants.

Utilities that serve Arapahoe County

UtilityTypeGridBusiness rateIndustrial rate
Public Service Co of ColoradoInvestor OwnedPublic Service Co. of Colorado (Xcel)11.8¢7.7¢
CORE Electric CooperativeCooperativePublic Service Co. of Colorado (Xcel)12.3¢9.4¢
Mountain View Elec Assn, IncCooperativeWestern Area Power Administration - Rocky Mountain Region13.1¢8.6¢
Morgan County Rural Elec AssnCooperativeWestern Area Power Administration - Rocky Mountain Region9.9¢12.4¢

Utilities that report serving Arapahoe County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Hillcrest Pump StationHydroelectric2.0 MW3.7 mi
Pivot Solar 9Solar1.7 MW6.2 mi
Pivot Solar 10Solar1.7 MW6.3 mi
Pivot Solar 21Solar5.0 MW6.3 mi
USS Great Plains Solar LLCSolar5.0 MW6.6 mi
USS High Plains Solar LLCSolar5.0 MW6.6 mi
USS Calico Solar LLCSolar5.0 MW7.0 mi
USS Raptor Solar LLCSolar5.0 MW7.0 mi
USS Tall Grass Solar LLCSolar5.0 MW7.0 mi
USS Hampden Solar LLCSolar5.0 MW7.0 mi

The largest power plant within 50 miles is Fort St Vrain, a 1,149 MW natural gas plant 40 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Time Warner DatacenterOperator not recorded2.2 ac4.3 mi
Flexential - DEN5Flexential1.0 ac4.6 mi
DataBank - DEN2DataBank1.4 ac4.8 mi
DataBank - DEN5DataBank2.5 ac4.9 mi

More

Data centers in Colorado · Data centers in Arapahoe County · All Flexential data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me