9 data centers are mapped in Arapahoe County, Colorado: 11 buildings covering about 21.3 acres (926,000 sq ft) of roof. Operators include DataBank, Flexential, Quality Technology Services, Verizon. The county is in EPA's Rocky Mountains grid region, whose electricity is 32% coal, 26% natural gas and 26% wind, at 1,036 lb of CO₂ per megawatt-hour.
Data centerUnder constructionPower plant (colored by fuel)
| Data center | City | Roof area |
|---|---|---|
| QTS | Aurora | 8.6 ac |
| Data center, 23505 East 6th Avenue, Aurora | Aurora | 4.2 ac |
| DataBank - DEN5 | Centennial | 2.5 ac |
| Time Warner Datacenter | Centennial | 2.2 ac |
| DataBank - DEN2 | Centennial | 1.4 ac |
| Xfinity/Comcast Data Center | Centennial | 1.2 ac |
| Flexential - DEN5 | Centennial | 1.0 ac |
| Verizon data center, Englewood | Englewood | 0.2 ac |
| Flexential - Denver - Aurora | Aurora | — |
Data centers in Arapahoe County draw from the regional grid. In 2023, electricity in EPA's Rocky Mountains region was 32% coal, 26% natural gas, 26% wind and 11% hydroelectric, at 1,036 lb of CO₂ per megawatt-hour, 35% more carbon per megawatt-hour than the U.S. grid as a whole (765 lb).
Share of electricity generated in EPA's Rocky Mountains grid region (RMPA) in 2023, from eGRID. 67.7 TWh from 310 plants.
| Utility | Business rate | Industrial rate |
|---|---|---|
| Public Service Co of Colorado | 11.8¢ | 7.7¢ |
| CORE Electric Cooperative | 12.3¢ | 9.4¢ |
| Mountain View Elec Assn, Inc | 13.1¢ | 8.6¢ |
| Morgan County Rural Elec Assn | 9.9¢ | 12.4¢ |
Utilities that report serving Arapahoe County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.
| Plant | Fuel | Capacity |
|---|---|---|
| Canyon Peak Power Station | Natural Gas | 157 MW |
| Hunter Solar, LLC (CO) | Solar | 75.0 MW |
| Titan Solar | Solar | 50.0 MW |
| Pivot Solar 21 | Solar | 5.0 MW |
| USS Tall Grass Solar LLC | Solar | 5.0 MW |
| USS Calico Solar LLC | Solar | 5.0 MW |
| USS Great Plains Solar LLC | Solar | 5.0 MW |
| USS Hampden Solar LLC | Solar | 5.0 MW |
| USS High Plains Solar LLC | Solar | 5.0 MW |
| USS Raptor Solar LLC | Solar | 5.0 MW |
| DADS Gas Recovery | Biomass | 3.2 MW |
| Arapahoe 3 Community Solar Array | Solar | 1.8 MW |
| Pivot Solar 9 | Solar | 1.7 MW |
| Pivot Solar 10 | Solar | 1.7 MW |
| Quincy II Solar Garden | Solar | 1.5 MW |
The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.
The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.