Google Data Center

Google Data Center is a data center in Chantilly, Loudoun County, Virginia. Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorGoogleas mapped
Grid CO₂590 lbper MWh, SRVC region
Nearest plant8.0 miPotomac Energy Center, LLC

Location

This data centerOther data centersPower plants (colored by fuel)

CountyLoudoun County, Virginia
Coordinates38.94336, -77.52704
On OpenStreetMapway/714622339

What powers Google Data Center

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Loudoun County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Loudoun County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Potomac Energy Center, LLCNatural Gas812 MW8.0 mi
Reston Town Center Solar 1Solar1.0 MW9.2 mi
VA- US Foods- ManassasSolar2.0 MW11.0 mi
Water Treatment Plant GeneratorsOil1.8 MW13.6 mi
Church Street PlantOil4.3 MW13.6 mi
Dominion/Lo MarOil19.2 MW13.8 mi
Godwin Drive PlantOil6.3 MW14.1 mi
VMEA 1 Credit GenOil13.2 MW14.1 mi
VMEA Peaking GenOil6.4 MW14.1 mi
Gateway GenOil3.6 MW15.1 mi

The largest power plant within 50 miles is Warren County, a 1,472 MW natural gas plant 35 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Google Arcola Building 1Google4.9 ac0.2 mi
Google Arcola Building 2Google6.6 ac0.2 mi
Google Arcola Building 3Google6.6 ac0.3 mi
IAD93Amazon Web Services0.4 ac0.3 mi
Amazon IAD-83Amazon Web Services3.6 ac0.4 mi
IAD609Amazon Web Services0.3 ac0.4 mi
Amazon IAD-81Amazon Web Services4.2 ac0.4 mi
Amazon Web Services data center, SterlingAmazon Web Services0.3 ac0.5 mi
Amazon IAD-68Amazon Web Services4.2 ac0.5 mi
Amazon IAD-62Amazon Web Services3.4 ac0.6 mi
Tech Park at BrambletonBlackChamber Group3.4 ac1.0 mi
BlackChamber Tech Park at BrambletonBlackChamber Group3.4 ac1.1 mi
Yondr Allegro SouthYondr7.6 ac1.3 mi
CyrusOne Sterling NVA9CyrusOne6.1 ac1.5 mi
Arcola Tech ParkOperator not recorded—1.6 mi

And 48 more within 5 miles.

More

Data centers in Virginia · Data centers in Loudoun County · All Google data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me