Google Mango Farm Building 3

Google Mango Farm Building 3 is a data center in Bristow, Prince William County, Virginia. It is mapped as 1 building covering about 6.6 acres (288,000 sq ft). Its power comes off the Virginia/Carolinas grid (PJM Interconnection), which runs on 40% nuclear, 39% natural gas and 10% coal.

OperatorGoogleas mapped
Roof area6.6 ac1 building
Grid CO₂590 lbper MWh, SRVC region
Nearest plant1.8 miVA- US Foods- Manassas

Location

This data centerOther data centersPower plants (colored by fuel)

Address13040 Rollins Ford Road, Bristow VA 20136
CountyPrince William County, Virginia
Coordinates38.77975, -77.58646
On OpenStreetMapway/1464257783

What powers Google Mango Farm Building 3

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Virginia/Carolinas grid region, and the county's largest utility is on the PJM Interconnection grid. In 2023, the region's electricity was 40% nuclear, 39% natural gas, 10% coal and 6% solar.

Each megawatt-hour carried about 590 lb of CO₂, 23% cleaner than the U.S. grid as a whole (765 lb).

Nuclear 40%Natural Gas 39%Coal 10%Solar 6%Biomass 2%

Share of electricity generated in EPA's Virginia/Carolinas grid region (SRVC) in 2023, from eGRID. 321 TWh from 1,273 plants.

Utilities that serve Prince William County

UtilityTypeGridBusiness rateIndustrial rate
Virginia Electric & Power CoInvestor OwnedPJM Interconnection8.9¢7.9¢
Northern Virginia Elec CoopCooperativePJM Interconnection6.2¢7.4¢

Utilities that report serving Prince William County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
VA- US Foods- ManassasSolar2.0 MW1.8 mi
Water Treatment Plant GeneratorsOil1.8 MW2.3 mi
Godwin Drive PlantOil6.3 MW5.0 mi
VMEA 1 Credit GenOil13.2 MW5.0 mi
VMEA Peaking GenOil6.4 MW5.0 mi
Dominion/Lo MarOil19.2 MW5.4 mi
Gateway GenOil3.6 MW5.6 mi
Church Street PlantOil4.3 MW6.9 mi
Energix Nokesville, LLCSolar20.0 MW7.5 mi
Reston Town Center Solar 1Solar1.0 MW17.5 mi

The largest power plant within 50 miles is Warren County, a 1,472 MW natural gas plant 34 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
Google Mango Farm Building 1Google6.6 ac0.3 mi
Google Mango FarmGoogle6.6 ac0.3 mi
Digital Realty VA4Digital Realty5.3 ac0.5 mi
AWS IAD110Amazon Web Services3.1 ac0.7 mi
AWS IAD111 under constructionAmazon Web Services3.1 ac0.8 mi
Corscale Gainesville - Building 3 under constructionCorscale Data Centers3.6 ac1.4 mi
Corscale Gainesville - Building 2Corscale Data Centers5.7 ac1.4 mi
Amazon IAD-73Amazon Web Services3.3 ac1.5 mi
Amazon IAD-74Amazon Web Services3.4 ac1.6 mi
Amazon IAD601Amazon Web Services0.3 ac1.6 mi
Corscale Gainesville - Building 1Corscale Data Centers—1.6 mi
Amazon IAD-193Amazon Web Services2.6 ac1.7 mi
NTT VA10NTT11 ac1.9 mi
Iron Mountain VA-1Iron Mountain3.7 ac2.1 mi
Amazon IAD-14Amazon Web Services2.7 ac2.2 mi

And 49 more within 5 miles.

More

Data centers in Virginia · Data centers in Prince William County · All Google data centers · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me