HiPerGator

HiPerGator is a data center run by University of Florida in Gainesville, Alachua County, Florida. Its power comes off the Florida grid (Florida Power & Light), which runs on 75% natural gas, 12% nuclear and 5% solar.

OperatorUniversity of Floridaas mapped
Grid CO₂782 lbper MWh, FRCC region
Nearest plant2.2 miMlh 3

Location

This data centerOther data centersPower plants (colored by fuel)

CountyAlachua County, Florida
Coordinates29.67282, -82.29976
Websitewww.rc.ufl.edu/services/hipergator/
On OpenStreetMapnode/8017899486

What powers HiPerGator

A data center doesn't run on the nearest power plant. It draws from the regional grid, where electricity from every plant on the system mixes. This site is in EPA's Florida grid region, and the county's largest utility is on the Florida Power & Light grid. In 2023, the region's electricity was 75% natural gas, 12% nuclear, 5% solar and 5% coal.

Each megawatt-hour carried about 782 lb of CO₂, close to the U.S. grid as a whole (765 lb).

Natural Gas 75%Nuclear 12%Solar 5%Coal 5%

Share of electricity generated in EPA's Florida grid region (FRCC) in 2023, from eGRID. 250 TWh from 255 plants.

Utilities that serve Alachua County

UtilityTypeGridBusiness rateIndustrial rate
Florida Power & Light CoInvestor OwnedFlorida Power & Light10.8¢8.0¢
Duke Energy Florida, LLCInvestor OwnedDuke Energy Florida12.3¢9.7¢
Clay Electric Cooperative, Inc - (FL)CooperativeSeminole Electric Cooperative10.8¢6.7¢
Gainesville Regional UtilitiesMunicipalGainesville Regional Utilities16.3¢12.7¢
Central Florida Elec Coop, IncCooperativeSeminole Electric Cooperative12.3¢9.5¢

Utilities that report serving Alachua County to the EIA (Form 861, 2024), largest first. Rates are each utility's average revenue per kilowatt-hour from commercial and from industrial customers across the state in 2024; a large data center usually negotiates its own contract.

Nearest power plants

PlantFuelCapacityDistance
Mlh 3Solar1.0 MW2.2 mi
Mlh 2Solar1.0 MW2.2 mi
John R KellyNatural Gas142 MW2.2 mi
Solar Park Gainesville, LLCSolar1.6 MW3.0 mi
South Energy CenterNatural Gas11.5 MW3.4 mi
University of FloridaNatural Gas54.2 MW3.7 mi
Butler PlazaSolar1.2 MW5.9 mi
Deerhaven Generating StationNatural Gas471 MW8.0 mi
Deerhaven RenewableBiomass116 MW8.7 mi
Micanopy Energy Storage FacilityOther Fossil8.3 MW11.3 mi

The largest power plant within 50 miles is Seminole (FL), a 1,898 MW coal plant 40 miles away.

Operating plants from EIA Form 860, by straight-line distance. Being close doesn't mean a plant supplies the site.

Other data centers within 5 miles

Data centerOperatorRoof areaDistance
UF Research Computing CenterUniversity of Florida0.8 ac0.0 mi

More

Data centers in Florida · Data centers in Alachua County · U.S. data center map

About this data

The list. Data center locations come from OpenStreetMap, where volunteers tag buildings as data centers (read 2026-11-23). There is no federal list of data centers, so this is the most complete public one, but it is not complete: new campuses, small server rooms and sites nobody has tagged are missing, and a tag is a mapper's claim, not a filing. Buildings of the same name and operator within about a mile, and untagged buildings right beside them, are grouped into one site. If you know a site is missing or wrong, fix it on OpenStreetMap and it will show up here at the next refresh.

The power. Each site is placed in an EPA eGRID subregion (the region of its nearest power plants) and shown that region's 2023 generation mix and CO₂ rate. The utilities listed are the ones that report serving the county on EIA Form 861 (2024); the grid operator is that of the county's largest utility. Nearest power plants come from EIA Form 860. A data center's actual supply depends on its contract and any power it buys directly, which operators rarely publish.

How the power-plant data is built · Data centers near me