Electric generating plantEIA plant no. 63999

Micanopy Energy Storage Facility

Type
Other Fossil
Nameplate capacity
8.3 MW
Units
1
In service since
2022
Operator
Duke Energy Florida, LLC
Location
Micanopy, Alachua County, Florida
Rated 295th largest in Florida · 6624th of 14,761 in the U.S. · by nameplate

Micanopy Energy Storage Facility is a other fossil power plant in Florida with a nameplate capacity of 8.3 MW.

The 8.3 MW is nameplate capacity: the most this plant's generators are rated to produce, not what it actually generates. EPA eGRID reports no positive net generation for it this year.

How it works

A battery storage site

charge middaydischarge evening1battery containers2inverters, both ways3the grid
  1. Rows of shipping-container-sized battery racks store electricity chemically.
  2. Inverters charge them from the grid — often midday, when solar is plentiful and cheap.
  3. In the evening peak the same inverters run the other way and send power back.

Why the numbers look like this: every charge-and-discharge cycle loses some energy as heat, so a storage site usually reports slightly negative net generation: it takes in a little more than it gives back. Its job is timing, not making energy.

This plant highlighted in navy-ringed pin; other generators within 25 miles shown as fuel-colored dots.

Natural GasSolarBiomass

Location

Address304 NE Highway 441
CityMicanopy
CountyAlachua County
StateFlorida
ZIP32667
Coordinates29.51120, -82.27483
OperatorDuke Energy Florida, LLC

Generators (1)

IDTechnologyFuelNameplate capacityStatusOnline
ES1BatteriesBattery8.3 MWOperating2022

Grid context

NERC RegionSERC
Balancing AuthorityDuke Energy Florida Inc

About Other Fossil plants

Micanopy Energy Storage Facility is a federally registered power generation facility in Florida.

Other plants in Alachua County

View all plants in Alachua County →

Data centers near Micanopy Energy Storage Facility

Data centerOperatorDistance
UF Research Computing CenterUniversity of Florida11.2 mi
HiPerGatorUniversity of Florida11.3 mi

Data centers mapped on OpenStreetMap within 25 miles. A data center draws from the regional grid, so being near this plant doesn't mean it buys this plant's power. U.S. data center map

Explore more